Finalizing Project Idea
Week 2 - 4
Finalized the Project Idea with the advices and comments from the supervisors.
Project Proposal
Week 5
Presented the Project proposal, complete with the problem we identified, the solution, and the basics of implementation and design. The Bill of Materials were included as well.
Project Proposal
Milestone 1
Week 6
We finalized the Project scope, including all the features we are planning on having, and the platforms and technologies we are going to use to develop our product. Product design was finalized.
Developing UI/UX Design
Week 7
The UI/ UX Design of the mobile application was developed using Figma. It contains login pages, signup pages, and dashboards for monitoring and controlling the greenhouse.
Complete Designing of Solution Architecture
Week 8
The flow of data and control were designed.
Milestone 2
Week 9
All technologies and software to be used were finalized. Testing and Security were looked into.
Presentation
CAD Design
Week 10
The Computer Aided Design (CAD) was designed and developed for the prototype of the product. All components were included.
CAD Design
Complete Full-Stack Development of Software
Week 11
Complete working front end (mobile application) and back end were developed for the software.
Presentation
Start Testing
Week 12
Testing of all the development up until now.
Cloud Development
Week 13
Development of cloud platform to host the data gained from sensors.
Milestone 3
Week 13
Full Stack was completely developed with deployment of it in AWS cloud
Presentation
Calibrating Hardware Components
Week 13
Start Testing Hardware Components Received By the Deparment while buying others from elsewhere and start calibrating the sensors we use
Start Building the Circuit
Week 14
According to the circuit diagram , the equipments were bought and circuit was connected while overcomming issues.
New
Admin
Finish Buiding the Proposed Final Prototype
Week 15
After Connecting the circuit and Connecting MicroController with Cloud, Final prototype of the product was started to Build.
Final Milestone
Week 15